Transmission analysis for special industrial machine
Activity duration : 180 h
INPUT
Analyze the transmission of a machine for industrial use in order to limit the critical issues encountered in operation
PROCESS
Analysis of operating conditions, gear calculation, bearing calculation, FEA of critical components, development of proposed interventions on the project
OUTPUT
Calculation report on evaluations made, design update proposals review
Design of a two speeds gear reducer pre-stage
Activity duration : 1000 h
INPUT
Designing a pre-stage of a two speeds gear reducer for energy field
PROCESS
2D preliminary design and following refining steps Actuator control system design 3D design of all parts and drawings
OUTPUT
General and detailed arrangement designs
Parallel axis reductor building
Activity duration : 480 h
INPUT
Building a special reductor to equip a prototype machine in energy field
PROCESS
Layout evaluation and drawing up Gears and bearings calculation Arrangement drawings setup Building of parts and assembling of reductor
OUTPUT
Supply of reductor and of arrangement drawings
Design of a two speeds gear reducer pre-stage
Activity duration : 250 h
INPUT
Designing a bevel gear pair for industrial applications
PROCESS
Drafting preliminary study; calculation of bevel gear and bearings according to a given load spectrum; FEM calculation of shafts; drafting final study
OUTPUT
Final study table; calculated component calculation report
CVT cooling system design
Activity duration : 800 h
INPUT
Design a cooling system with continued variation of ratio for an energetic plant
PROCESS
Layout and load analysis; Preliminary design and following refining steps; Calculation of all parts of transmission
OUTPUT
General and detailed arrangement designs; Calculation report